The project
is part of PWC's on-going maintenance program to re-condition sections
of the water system, in order to ensure customers continue to receive
quality and dependable water service. During the project, it is necessary to temporarily take water mains out of service and PWC will connect residents and businesses along the route with a temporary water supply. Connections are made to customer's existing service line from temporary pipelines laid alongside the curbs on each side of the street. The temporary water service is connected to the PWC system; therefore, there should not be any change in the water quality. In the project area, openings in the street pavement will allow access to the water main and to accommodate the bypass pipelines running across intersections and driveways. All openings will be covered when not in use and will be resurfaced as soon as possible after the project is finished. Every possible safety precaution will be taken and all work areas will be barricaded and marked to prevent injury. Residents can help by avoiding the work area as much as possible and cautioning others to watch their step. If a problem
should occur as a result of this work, residents can contact the PWC
Water Resources Engineering Department at (910) 223-4730 during normal
business hours. After normal hours, please call the emergency dispatch
at 1-877-OUR-PWC1.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||