Inspections/Permitting

Inspections

1. All new construction locations must have an inspection performed and on file at the City of Fayetteville Inspection Department before electric service can be activated.
2. When any work occurs inside a meterbase – to new or existing services, it must be inspected before power can be supplied.
3. If power is off at a location for 6 months or more, an inspection must be performed before power can be supplied.
4. For more information, please call the City of Fayetteville Inspection Department at (910) 433-1707/1714/1056 or visit their website.


Permits

Demolition permits must be obtained from the City of Fayetteville Inspections Department at City Hall. A copy of the demolition permit must be presented to the PWC Electric Construction department before electric lines can be removed from demolition location. For more information, please call the City of Fayetteville Inspection Department at (910) 433-1707/1714/1056 or visit their website.