ANNEXATION PHASE V - ARRAN PARK, WINTERHILLS

Project 14 - Arran Park, Winterhills

Project Details Downloads
Search Installation by Street Preliminary Assessment Letter (PDF)
Estimated Construction Start: 2013 Project Map (PDF)
Estimated Completion: TBA Construction Schedule: TBA
Estimated Cost: TBA Installation-What to Expect (PDF)
Served: 237 How to Connect (PDF)
Engineer Design Firm: Moorman, Kizer & Reitzel Assessment (PDF)
Construction: TBA What To Expect During Installation


The Construction Process

There are several phases to the construction process. PWC ensures that the Contractor makes every effort to limit interruptions and the impact on residents during each phase of the construction process.

First, you will see design engineers and surveyors canvassing the area to determine the layout of the sewer collection system. Once the design is complete, the project will be bid and the construction phase will begin.

When construction begins, asphalt will be removed from the street and excavation crews will begin installing the sewer mains. This is typically done in one city block-sized area at a time.

A second excavation crew will then install the laterals from the sanitary sewer main to the right of way. It will be the homeowner's responsibility to connect from the clean out to the home once they are notified connections can begin.

Smaller excavations may be necessary throughout the construction process to test the lines and perform compaction testing to ensure the new asphalt does not fail.

Once all excavation and testing have been completed, the contractor will then patch the asphalt and restoration will take place.

This information is subject to change.