<< back to Environmental System Protection Home Page Procedures to Obtain a Commercial Domestic, Lawn Irrigation, and/or Fire Protection Service (Sprinkler Meter)
3. PWC makes the Water Tap. Approximately four to six weeks (usually within 30 days) after the tap order has been processed. PWC will install the service. If possible, PWC will install the domestic, and or lawn irrigation meter box's adjacent. * NOTE: WATER METER IS NOT INSTALLED AT THIS TIME. * 4. Purchase and install a Backflow Prevention Assembly. While the customer is waiting on PWC to make the tap, the backflow prevention assembly can be purchased and installed. The customer has the option of installing the backflow prevention assembly before or after PWC makes the tap. It is advised to wait until after PWC makes the tap. Be advised that PWC's Environmental System Protection / Cross Connection Control office has specific installation specifications for the backflow prevention assemblies. You can obtain a copy of the specifications by contacting PWC's Environmental System Protection /Cross Connection Control Department at 223-4754. 5.
Questions regarding backflow assemblies and specifications should be addressed
to PWC's Environmental System Protection / Cross Connection Control Department
at 223-4754. An approved Reduced Pressure Principle Assembly shall
be required to protect all lawn irrigation services. PWC will provide
an information packet of approved backflow assemblies, detailed installation
specifications, and a list of companies who employ certified backflow
prevention assembly testers. The cost, installation, test and repairs
of the backflow prevention assembly are the responsibility of the customer.
PWC will not be responsible for conducting annual testing of commercial
backflow prevention assemblies, or any repairs that are deemed necessary
by PWC. At the customer's expense, a certified tester must perform all
repairs and subsequent retesting. Revised 12/27/07 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||