Annexation Phase V – Project 27 – Cliffdale Forest

Project Details

  • Design Start: April 2020
  • Design Completion: June 2022
  • Construction Start: TBD
  • Available for Connection:
  • Services:   234
  • Engineer Design Firm: WK Dickson

The Design Process

Design for this project area is being performed earlier than the original project schedule due to the accelerated schedule of the NCDOT proposed Fayetteville Outer Loop which divides this project area. Installation start date is still to be determined.

This information is subject to change.